
Hotel Ilunion Fuengirola
Project Management and Interior Design for hotel´s second integral overhaul.

Málaga
Place
Ilunion Hotels
Client
2018
Year
We have done
- Interior Design y FF&E
- Project Management
-
4
weeks
-
180
rooms
-
2
M€ investment
Context
The hotel has maintained the same image since 2004, which is also the same year in which we made the complete renovation to adapt it to the standards of Ilunion Hotels that the establishment had just acquired.
Solution
We perform a total redistribution. The lobby, cafeteria and lounges have been joined with a more luminous and open distribution incorporated in the marine promenade. We designed and renovated the ground floor, the restaurant and its 180 rooms with the hotel open, all within 4 weeks.
As chain´s technical department, we develop all the projects and carry out the project management of the renovation and new construction of each hotel of Ilunion Hotels.
Accessible design
Accessibility for all
We have put all of our hotel experience into collaborating with the chain so that each of Hotel Ilunion´s hotels represents quality and excellence in accessible design.





